Project details
PROJECT

Operations Centers for XVIII Pan American Games 2019

The Pan American Games is a major multi-sports event in the Americas that is held every four years in summer. In 2019, the event took place in Lima, Peru, attracting thousands of athletes from nations in South and North America. The opening ceremony transpired on July 26 at the National Stadium, where the Games were declared open by the President of Peru Martín Vizcarra. The Pan American Games of 2019 were held at venues in and around Lima, and are the largest sporting event ever hosted by the country, according to the information from Wikipedia.
Requirements
The games were monitored via several operations centers that kept track of the tournaments and monitored security. The operations process required the display of numerous video feeds on various screens. The video feeds came from different sources, such as IPTV streaming of sports competitions, CCTV feeds to monitor safety and some operational videos for internal purposes. These video streams were displayed in the Main Operation Center (MOC) and TELCO Operation Center on 4 Videowalls, 2 Video Projectors and 5 49” TV’s. The key task of the project was to minimize the response time of both operational centers. All the content had to be managed centrally. The system had to work 24/7 and be easily administered. As the installation was temporary for the period of the games, it was important for the customer to use minimal cabling.
Industry
Government, Sports
Project type
Сonference Rooms
Customer
PROYECTO ESPECIAL PARA LA PREPARACIÓN Y DESARROLLO DE LOS XVIII JUEGOS PANAMERICANOS DEL 2019
Integrator
TELVICOM, S.A.
Year
2019
Location
LIMA, PERÚ
Polywall version
Polywall PRO
Solution
The Main Operations Center featured two 3X3 videowalls assembled from 55” Samsung displays and one 3X2 videowall assembled from a 55” LG display. The room also included one HITACHI and one EPSON projector, as well as a 49” Advance TV and a PC with a Polywall server installed on it.

TELCO operations center included one 3X2 videowall assembled from 49” LG displays, as well as four 49” Advance TVs and a PC with Polywall Visualizer.

Polywall helped manage content on all display devices (videowalls, projectors and TV’s) according to the requirements of each operations center. Deployment of Polywall in this project facilitated management of content and makes the solution versatile. Another important factor was the availability of customer support.
Video wall size
4 videowalls: 2 X 3X3; 2 X 3X2
Display brand
2 Samsung 55” Displays, 1 LG 55” Displays and 1 LG 55” Displays

Similar projects

CONTROL ROOMS
Pavlodar Monitoring and Control Center, Kazakhstan
SITUATION CENTER
Visualization Center for SOCAR
AV network
Video Wall for Nordjyske Medier News Agency
CONTROL ROOMS
Integrated Monitoring Center for Banco GNB Paraguay
The cookie settings on this website are set to 'allow all cookies' to give you the best experience. Please click on Accept Cookies to continue to use the website.