The main control room features a video wall built from 32 projection modules in an 8x4 (67") configuration produced by Mitsubishi Electric. The overall resolution of the video wall is 11,200x4,200 pixels. The size of the wall is 1,089x408 cm. To ensure reliable installation and quality image blending produced by projection modules, the Polymedia team used specialized mounting structures tailored to this project.
The training hall is equipped with a video wall built from six projection modules in a 3x2 configuration. In addition to personnel training, the hall can be used as a backup control room.
Within the scope of the project, the team developed specialized software, which helps display power pool schemes in structural and commutation forms. The structural form shows all the main power sites in a simplified format (400 stations and substations). The commutation form is used for the topological analysis of the equipment condition in the power network.